29 March 2021 , 11:41 WIB / news

MUSI RAWAS – Palm oil plantation company in South Sumatera, PT. Cisadane Sawit Raya did pile and strengthen the way with Lethal by hoping that the infrastructure in the two ways, Rompok Kerbau and Rompok Bangsi, Dusun IV, Village of Beringin Makmur II, Sub district of Rawas Ilir, District of Busi Rawas would be better.

Through its subsidiary for instance, PT. Ina Zefanya Ataya (IZA), handed over 200 cubic of lethal to strengthen the way for about 200 meters in Rompok Kerbau by using excavator. It is hoped that the villagers could pass through without any disturbance.

From the information to PalmOilMagazine, it was held on 17 – 18 December 2020. It was done in Rompok Bangsi by distributing 300 cubic of lethal to pile four spots of the broken way by using excavator. “It was done on 22 – 23 February 2021,” the company noted.

The company also improve the tunnels in Dusun IV, Rompok Danau by providing 6 units of tunnel to replace the previous broken tunnels in the main access. (*)

Source: https://www.palmoilmagazine.com/news/8610/cisadane-sawit-raya-did-pile-with-lethal-in-dusun-iv--beringin-makmur-ii